anyHost Datacenter - Maintenance window, 16.07.2016

Please be advised that we will be performing the generator load test at our Data Center B20.

A good preventive maintenance program preserves assets, keeps things running in optimum condition, avoids both long and short term losses and helps insure that maximum life expectancy is achieved. So Generator tests are one of the key approaches in the preventive maintenance program. With this test all functions of the power system will be tested under load including alerting and automatic re-fueling. During the test, customer load from Powernetwork "B" will be transferred from Utility to the Generators.

We expect no degradation of power in the data center.

This test affect only one of the two power networks:

Activities Type:
[x] Preventive Maintenance Activities
[ ] Other Activities

Description/Activities:
* Generatortest with Datacenter load Powernetwork B

DataCenter:
* anyHost Datacenter

Outage risk:
[ ] expected impact for customer
[x] no expected impact

If expected impact:
-

Maintenance window:

* Date: 2016-07-16 08:00-10:00 (local time)

For questions related to this, you can contact us
Wenn Sie Fragen dazu haben lassen Sie sich durch einen Reseller beraten oder rufen Sie uns an:

http://www.anyhost.ch/index.php/5ueberuns/kontakt

Während den Bürozeiten, FON: +41 32 512 14 90

anyHost Datacenter
TOC (Technical Operation Center)